20 September 2018

12,800 m² of foil liner in 4Evergreen irrigation basin

Albers Alligator has installed foil liner measuring a total of 12,800 m² in an irrigation basin. This was done as commissioned by contracting firm van Daalen at 4Evergreen in Westdorpe. The basin is provided with an intermediate dyke. Two foil sections measuring some 6,000 m² each were prefabricated at Albers Alligator for the assignment. To combat algae the basin is fully covered by a floating ‘MULTI-F’ covering.